Cercal do Alentejo Area, Alentejo

Community Farm, Cercal do Alentejo

  • 2 km Farm Water Network
  • Remote Master Valve
  • Developed in Phases Since 2019

A farm water network developed phase by phase since 2019: a 2-kilometre primary line, a remotely controlled master station, and automated irrigation for the greenhouse and orchard.

Design and installation of a complete farm water network, developed phase by phase since the project began in 2019.

A primary distribution network spanning 2 kilometres serves both irrigation and general water use across the property, built for long-term reliability and future expansion.

Two RTUs run the system. The first sits at the water master station, with water meters on all three main lines and a master valve that can be shut off remotely or automatically. The second automates irrigation for the greenhouse and the orchard.